Consulting engineering services for

Central Water Supply Project for Tabuk

And Other Coastal Cities and Towns

Main Pumping Station at Production Wellโ€™s Field

 

Client : Directorate Water of Tabouk

Description : Design Review and Construction Supervision for 2nd , 3rd , 4th , 5th phases of The Central Water Supply Project for Tabuk

 

The projects have its own separate support facilities development which the support facilities consisted on the master plan typically For operation Development as follows: Main pump station, Generator Building , Chlorination building, Administration building , Transformers , electrical and mechanical workshops, storage area, main water reservoir, open type lagoon and the residential development are as follows : Mosque, Engineers building, foremen building, villas, security guard house, transformers, parking and parks with post lighting design.

 

For Electro Mechanical, ductile pipes vary in the sizes from 300mmรธ, 600mmรธ, and 1200mmรธ and strategic locations of deep wells with macadam road networks. For the equipment used are all American/British/International standards from the state of the art, flow meter control valves to the jacket type connection of joints and with proper mill certificate and ISO standards guaranty. Moreover, with the Latest system to withstand the weather from heat, cold and humid conditions.

 

Instrumentations and controls applied from SCADA-systems and control panels of Schneider panels and devices. In addition to BOSCH CCTV Surveillance system,   SIMPLEX fire alarm system, fire detectors and strategic control of fire hydrants applied.

  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 1
  • 2
  • 3
  • 4
  • 5

  • Project Categories

    • Architecture and building
    • Transportation
    • Water and Waste water
  • Recent Projects

    • Asphalting Buraydah east villages
    • Asphalting Buraydah villages
    • Settlement and determine the grant schemes Buraydah 2
    • Settlement and determine the grant schemes Buraydah 2
    • Grant schemes Buraydah
    • Paving the streets of north Buraydah
    • Paving the streets of East Buraydah
    • Paving the streets of South Buraydah
    • Development of a landfill Buraidah
    • Central Water Supply Project for Tabuk
    • Water and sanitation projects Afif Governorate
    • Expansion of sewage water treatment plant in Unaizah
    • Supervision contract on customer services building in tabuk
    • Our Project Portfolio



Copyright ยฉ HOSCE, Developed By SEO Expert.